Single-circuit meter installation guide:

  • Current measurement : Mount current transformers (CTs) on power cables upstream of breaker. Typical ratios: 50/5A, 100/5A, 200/5A depending on circuit load. Secondary terminals connect to meter CT inputs.
  • Voltage measurement : Connect phase conductor (L1) and neutral (N) to voltage inputs. For three-phase installation, connect all three phases (L1, L2, L3) + N for balanced measurement.
  • Grounding : Meter chassis earth must connect to installation earth bar (safety + EMC immunity).
  • Communication setup : Modbus RTU on RS485 twisted pair (shielded CAT5e or CAT6) with 120Ω termination resistors. Maximum 1200m distance at 9600 baud. For Modbus TCP, use standard Ethernet (RJ45).
  • Baudrate & addressing : Default 9600 baud, 8 bits, 1 stop, no parity. Assign unique device address (slave ID 1-247).
  • Standards compliance : Socomec meters comply IEC 62053-22 (electricity meters), MID Directive 2014/32/EU for certified measurements.